Project Achievements from 1993 to 2000

A. Bridge Construction

  1. Proposed Tampines Expressway Phrase III-Interchange at Seletar Expressway (1993~1994-Torie Construction PL)
  2. Access Road to Tanah Merah Ferry Terminal (1995-OKG)
  3. Jalan Ahmad Ibrahim Road / Upper Lorong Road interchange (SPS Beam) & Viaduct Connecting Tuas Check Point. (1996~1997-Wee Poh Construction Co. PL)
  4. Proposed Flyover RC Structure Expansion of Adam Road/Farrer Road Interchange (1996~1998)-Obayashi)
  5. Proposed Widening of Keppel and South Cudahy Viaduct (1998~1999-Sum Keong Construction PL)

B. Heavy Industrial Plant / Factory

  1. Design Procurement & Construction of A200,000 MTA Polyethylene Plant at Pulau Ayer, Merbau Singapore (1995~1996 – Daelim Industrial Co. Ltd)

C1. MRT and LRT Station (Non CD Design)

  1. MRT Contract 618 -Cast In-Situ Viaduct & MRT Station (1993~1996-Hyundai Engineering &Construction Co. PL)

C2. MRT and LRT Station (CD Shelter Design)

  1. NEL-MRT C702 - Buangkok Station, Sengkang Station and associated Tunnels (1998~2000-Sato Kogyo-HLS JV)
  2. NEL–MRT C710 – Outram Park Station, Cut & Cover Tunnel, Linkway & Escape Shaft (1999~2000-SDK JV)

D. RC Tunnel Work & Underpass – NIL

E. Drainage and Sewerage Structure

  1. Proposed Ponai Station Retaining Wall & Bridge, Abstraction Station, Part SLE / BKE interchange (1995~1997-Chew Eu Hock Construction Co.)
  2. Proposed Sludge Treatment Work at Chestnut Ave Waterworks on Lot Mukim No. XV L at Bukit Timah (1997~1999-Lek San Construction PL)
  3. Proposed Sludge Treatment at Choa Chu Kang (1998~1999-Lek San Construction PL)

F. Commercial and Residental Building

  1. Proposed Erection of 2 Block Residential Flat Development with Basement & Swimming pools (1994~1997-Torie Construction)

G. Port/Jetty/Container Storage Yard

  1. Construction of stacking yard and Jetty for PSA (1993~1994 - Koh Brother)
  2. Sembawang Shipyard Extension at Pasir Gudang Malaysia (1994 – G&C)
  3. Construction of Stacking Yard Behind Berth K18 to K22 (Phase II) at Tanjung Pagar Gate 4 (1994- Wing Construction)

H. Runway & Parking Apron

  1. KLIA – Apron & Cross Taxiway W2/X3-South RA 05, Malaysia (1997- Citra Muda Ready Built-Konsorsium)
  2. KLIA – Engineering Support Building, Malaysia (1997~1998 - Nam Fatt - Gurun JV)

I. OTHER - Nil